Home » Repair & Maintenance Services » STP Maintenance » Wtp Plant Maintenance Services
Wtp Plant Maintenance Services
₹ 2,00,000 Get Latest Price
Service Features
| Model | Wtp Plant Maintenance Services |
| AMC Required | Yes |
| Frequency | Yearly |
| Kind Of Application | Commercial |
| Layout Size Of A Plant | <2500 Square Feet |
| Service Location | Commercial |
| Type Of Maintenance | Predictive Maintenance |
| Type Of Plant | Water Treatment |
| Usage/Application | Railroad Rolling Stock |
GST No - 07AUIPN5040K1ZG | Member since 2024
FIRST FLOOR, BACK SIDE, C-183, SHAHEEN BAGH, ABUL FAZAL ENCLAVE PART-2, JAMIA NAGAR, OKHLA, South East Delhi, Delhi, 110025
There are four main tasks in the maintenance of a water treatment plant. Cleaning. Inspection and repair. Replacement of spare parts. Tests. Read More...
Service Details
There are four main tasks in the maintenance of a water treatment plant. Cleaning. Inspection and repair. Replacement of spare parts. Tests.Water treatment plants also commonly adjust water pH and add fluoride after the disinfection step. Adjusting the pH improves taste, reduces corrosion (breakdown) of pipes, and ensures chemical disinfectants continue killing germs as the water travels through pipes.The function of the main water treatment plant is to purify the raw water intake and render it suitable for use as boiler make-up water. In the pre-treatment section, the raw water is dosed chemically for pH correction and solids coagulation, and then filtered to remove suspended solids.
FIRST FLOOR, BACK SIDE, C-183, SHAHEEN BAGH, ABUL FAZAL ENCLAVE PART-2, JAMIA NAGAR, OKHLA, South East Delhi, Delhi, 110025
Send your enquiry to supplier
Related Services
STP Maintenance Service, Mumbai,Maharashtra
₹ 60,000
| Plant Services : Construction |
| Service Location : Mumbai,Maharashtra |
| Service Mode : Offline |
| Time Duration : 1-4 Day |
Sewage Treatment Plant Maintenance Service
₹ 50,000
| Payment Mode : Online/Offline |
| Service Duration : 6-7 Days |
| Service Location/City : Pan India |
| Service Mode : Offline |
Preventive/Breakdown Monthly STP Maintenance Services, Local
| Availability : In Stock |
| Frequency : Monthly |
| Plant Services : Blowers,Pump,MBBR Tube Settler-Sand-Carbon Media |
| Service Location : Local |
Industrial Wastewater Treatment Service
₹ 50,000
| Features : Cost Effective |
| Payment Mode : Offline And Online |
| Service Duration : 15 Days |
| Service Location : Pan India |
Yearly Etp Stp Operation And Maintenance, Maintenance Part: Motor
₹ 50,000
| AMC Required : Yes |
| Delivery Time : 2 week |
| Frequency : Yearly |
| Maintenance Part : Motor |
Yearly Sewage Treatment Plant Maintenance, Delhi Ncr, Commercial & Industrial
₹ 65,000
| Age Of Machine : not an issue ( only in working condition) |
| AMC Required : Yes |
| Capacity : 35 kld |
| Complaints Or Issues : lack of plant running |
Water Treatment Yearly Wtp Plant Maintenance Services, For Railroad Rolling Stock, Commercial
₹ 50,000
| AMC Required : Yes |
| Frequency : Yearly |
| Kind Of Application : Commercial |
| Layout Size Of A Plant : <2500 Square Feet |
₹ 58,000
| Availability : In Stock |
| Service Duration : 1-12 Month |
| Service Location : All Over India |
| Service Mode : Offline |
Customer Reviews
Submit your Reviews
Top services from Hydro Water Recycling Technology
Water Treatment Yearly Wtp Plant Maintenance Services, For Railroad Rolling Stock, Commercial
₹ 50,000
| AMC Required : Yes |
| Frequency : Yearly |
| Kind Of Application : Commercial |
| Layout Size Of A Plant : <2500 Square Feet |
